Lodge Road Drainage Works Extended

We have been advised by our contractor that the Lodge Road drainage scheme will take longer than originally anticipated.

Works in Lodge Road itself will be completed before Christmas as originally planned, allowing us to remove the road closure from Lodge Road and enable the bus service to return to normal operation.

Works in Odell Road (using temporary traffic signals) and works in Pinchmill Close (using a road closure), will now be undertaken between 4th January and 23rd January 2016.

I will arrange for the signs on site to be updated to notify the travelling public, and I will also arrange for a letter drop to residents of Pinchmill Close early next week.

Please do not hesitate to contact me if you have any queries.

Kind regards,

Thomas Emmett MIHE
Project Engineer